Step-by-step answer
Stretch 60 min5 stepsWrite a capacity plan for doubling the fleet
A percent-format notebook over synthetic inputs that computes RPM, ITPM and OTPM demand per model bucket at 1x and 2x, with and without batch offload and a Haiku classifier, then the Kingman wait at the limiter and Erlang C worker counts. The plan moves to Build with deferrable work in batches, picks a 70% utilisation ceiling from burstiness, and names the load test that must confirm it.
Back to the exercise